{"id":4339,"date":"2024-07-23T09:13:07","date_gmt":"2024-07-23T07:13:07","guid":{"rendered":"https:\/\/it.abeienergy.com\/proyectos\/psfv-mudarra-1\/"},"modified":"2024-10-24T12:28:14","modified_gmt":"2024-10-24T10:28:14","slug":"mudarra-i-photovoltaic-plant","status":"publish","type":"proyectos","link":"https:\/\/abeienergy.it\/en\/projects\/mudarra-i-photovoltaic-plant\/","title":{"rendered":"Mudarra I Photovoltaic Plant"},"content":{"rendered":"\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t
\n\t\t\t\t\t
\n\t\t
\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\tMudarra I Photovoltaic Plant\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

Location: Spain<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

Status: Under construction<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t
<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

Project details:<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t
  • Capacity: 53,16 MWp<\/strong><\/li>
  • Modules: 94.460 units, 575 Wp bifacial<\/strong><\/li>
  • Structure: 1V single-axis tracker<\/strong><\/li>
  • Inverter: 8×5 (central 1,2 MWn)
    <\/strong><\/li>
  • Nominal Capacity: 49,8 MWn<\/strong><\/li>
  • Interconnection Point Capacity: 38,5 MW<\/strong><\/li>
  • Generation: 103.093 MWh\/year<\/strong><\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t
    \n\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\t\t\t\t
      \n\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tLocation: Villalba de los Alcores, Valladolid, Spain<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tClient: -<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tBudget: Confidential<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tExecution Time: 11 months<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t
    • \n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/i>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\tCommercial Operation: Expected December 2025<\/b><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"author":1,"featured_media":4163,"template":"","categories":[],"tags":[],"class_list":["post-4339","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/proyectos\/4339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"author":[{"embeddable":true,"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/proyectos\/4339\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/media\/4163"}],"wp:attachment":[{"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/media?parent=4339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/categories?post=4339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abeienergy.it\/en\/wp-json\/wp\/v2\/tags?post=4339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}