Cartuja Photovoltaic Plant
Location: Spain
Status: Operational
Project details:
- Capacity: 49,99 MWp
- Modules: 94.308 units, 530 Wp bifacial
- Structure: 1V single-axis tracker
- Inverter: 2×9 (central 2,6 MWn)
- Nominal Capacity: 46,8 MWn
- Interconnection Point Capacity: 43 MW
- Generation: 100.000 MWh/year
- Location: Jerez de la Frontera, Cadiz, Spain
- Client: Everwood Capital
- Budget: Confidential
- Execution time: 11 months
- Commercial operation: October 2021